Complete rehabilitation of the heat distribution infrastructure for an industrial platform in Baia Mare.
The existing heating system, over 25 years old, presented major thermal losses (estimated at 22%), inconsistent network pressure, and frequent failure points that affected the continuity of production processes.
We adopted a phased intervention strategy, based on a digital twin model of the existing network. The project was structured into three main engineering stages:
Laser scanning of all pipelines and critical nodes to create an accurate map of the physical state and insulation.
CFD analysis to optimize pipe diameters, pump positioning, and balancing valves.
Development of assembly plans, material lists, and switching procedures for each sub-network.
The works were executed on an aggressive 9-month schedule, using high-efficiency equipment and preformed calcium silicate insulation.